
Best Price ABB 07KT94-98 GJR5252590B0012 ModuleOne Year Warranty
Description
The most important times for the application of the basic unit 07 KT 94 with or without connected remote modules are:
• The reaction time is the time between a signal transitionat the input terminal and the signal response at the output terminal.
In case of digital signals, the reaction time consists of the input delay, the cycle time of the program processing and the bus transmission time, if the system is expanded by remote modules.
• The cycle time determines the time intervals, after which the processor restarts the execution of the user program.The cycle time has to be specified by the user. It should be greater than the program processing time of the user program plus the data transfer times and the related waiting times. The cycle time is also the time base for some timecontrolled functions, such as for the PID controller.
• The program processing time is the net time for processing the user program.
Pambo Wu
Servo module Parts Limited
Phone: +86 13306036024 (Whats-app, Skype)
Wechat:High-Five-PLC
Email: sales@5gplc.com
